Kniha Project Management with Dynamic Scheduling Mario Vanhoucke

Project Management with Dynamic Scheduling

Jazyk: Angličtina
Väzba: Pevná
Vydavateľ: Springer
Dostupnosť: 50 % šanca
Prehľadáme celý svet
109.78
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of p...

Informácie o knihe

Jazyk
Angličtina
Väzba
Kniha - Pevná
Vydalo
2012
Stránok
310
EAN
9783642251740
ISBN
3642251749
Enbook ID
01229675
Vydavateľ
Hmotnosť
627
Rozmery
165 x 245 x 24

Kompletný popis

The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Leuven Gent Management School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project s time and cost reserves.

Mohlo by vás zaujímať

Chloroplast Biogenesis

Udaya C. Biswal
149.45
63.46

Rev Me Up

Kylie Gilmore
13.02

MACROLEPIDOPTERA OF THE WORLD

Adalbert 1860-1938 Seitz
21.24
11.65

Tarot

JEFF NEVES
22.42
90.19

Living with Wine

Samantha Nestor
63.95
7.43
38.77

Without Warning

Lynette Eason
16.15
69.63

PUPIL AS SCIENTIST

Rosalind Driver
35.05

Zákazníci, ktorí si kúpili túto knihu, kúpili tiež

21.63

18 STUDIES OP. 109 PIANO

FRIEDRICH BURGMULLER
19.48
6.36
6.65