Kniha Critical Paths Dan Miller

Critical Paths

Blake and the Argument of Method

Autor: Dan Miller
Jazyk: Angličtina
Väzba: Pevná
Vydavateľ: Duke University Press
Dostupnosť: 50 % šanca
Prehľadáme celý svet
172.37
The great expositors of Blake and those who have followed in their footsteps have clarified the most...

Informácie o knihe

Autor
Jazyk
Angličtina
Väzba
Kniha - Pevná
Vydalo
1987
Stránok
394
EAN
9780822307518
ISBN
0822307510
Enbook ID
04936001
Hmotnosť
816
Rozmery
150 x 230 x 36

Kompletný popis

The great expositors of Blake and those who have followed in their footsteps have clarified the most minute particulars of Blake's vision. Now, in the place of traditional exegesis, comes a significantly new set of critical problems and interpretive methods. In this volume of essays, the major shift in Blake studies, already under way in practice, is addressed, gauged, analyzed, and debated.The contributors assembled here, leading exponents of contemporary critical methods as well as close students of Blake, argue the grounds, purposes, and validity of each approach and then apply its method in detailed readings of Blake's works. We see deconstruction, psychoanalytic interpretation, feminist critique, semiotic analysis, Marxist criticism, revisionism, and other methods brought to bear on Blake's texts and into confrontation with one another by those best able to do so.Through the essays themselves and in the reaction they will certainly provoke, Critical Paths will bring increased theoretical awareness to the study of Blake and will further the ongoing redefinition of Blake's art. At the same time, the collection investigates the general problem of methodology in literary studies by means of a casebook examination of modern critical approaches. Blake criticism and current literary theory here come together; the encounter illuminates and enriches both.

Mohlo by vás zaujímať

Born to Swim

Sabir K. Muhammad
14.33
17.87
17.87

Where to Play

Marc Gruber
21.11

Life of Abraham Lincoln

Clifton Melvin Nichols
22.58

In His Eyes

Barbara Lohr
11.97
19.64
8.83

DER HOPFENBAU

JAKOB ERNST VON REID
13.45
268.63

Heaven's Door

Colin Turner
14.33
106.17

Syntax of Icelandic

Höskuldur Thráinsson
138.19

Zákazníci, ktorí si kúpili túto knihu, kúpili tiež

130.14

Antología

Unamuno
23.27
30.15

Glamour Attitude

Jay McInerney
22.97
7.65
8.83

Léčení čaker

John R. Cross
10.52